查看标准

请选择需要导出的字段:

ASTM D5299-1999(2005)

环境保护用地下水井、渗流区监测装置、地上凿洞和其他装置的报废指南

Standard Guide for Decommissioning of Ground Water Wells,Vadose Zone Monitoring Devices,Boreholes,and Other Devices for Environmental Activities

适用范围:<p id="s00065">Decommissioning of boreholes and monitoring wells, and other devices requires that the specific characteristics of each site be considered. The wide variety of geological, biological, and physical conditions, construction practices, and chemical composition of the surrounding soil, rock, waste, and ground water precludes the use of a single decommissioning practice. The procedures discussed in this guide are intended to aid the geologist or engineer in selecting the tasks required to plan, choose materials for, and carry out an effective permanent decommissioning operation. Each individual situation should be evaluated separately and the appropriate technology applied to best meet site conditions. Considerations for selection of appropriate procedures are presented in this guide, but other considerations based on site specific conditions should also be taken into account.</p> <p class="desc"> <span class="smallcap">Note</span> 68212;Ideally, decommissioning should be considered as an integral part of the design of the monitoring well. Planning at this early stage can make the decommissioning activity easier to accomplish. See Practice D 5092<astmref rid="a00006"> for details on monitoring well construction.</p> <p id="s00066">This guide is intended to provide technical information and is not intended to supplant statutes or regulations. Approval of the appropriate regulatory authorities should be an important consideration during the decommissioning process.</p><p>1.1 This guide covers procedures that are specifically related to permanent decommissioning (closure) of the following as applied to environmental activities. It is intended for use where solid or hazardous materials or wastes are found, or where conditions occur requiring the need for decommissioning. The following devices are considered in this guide:</p><p>1.1.1 A borehole used for geoenvironmental purposes (see ),</p><p>1.1.2 Monitoring wells,</p><p>1.1.3 Observation wells,</p><p>1.1.4 Injection wells (see Note 0),</p><p>1.1.5 Piezometers,</p><p>1.1.6 Wells used for the extraction of contaminated ground water, the removal of floating or submerged materials other than water such as gasoline or tetrachloroethylene, or other devices used for the extraction of soil gas,</p><p>1.1.7 A borehole used to construct a monitoring well, and</p><p>1.1.8 Any other vadose zone monitoring device.</p><p>1.2 Temporary decommissioning of the above is not covered in this guide. Note 2This guide may be used to decommission boreholes where no contamination is observed at a site (see Practice D 420 for details); however, the primary use of the guide is to decommission boreholes and wells where solid or hazardous waste have been identified. Methods identified in this guide can also be used in other situations such as the decommissioning of water supply wells and boreholes where water contaminated with nonhazardous pollutants (such as nitrates or sulfates) are present. This guide should be consulted in the event that a routine geotechnical investigation indicates the presence of contamination at a site.</p>Note 0<p>The term "well" is used in this guide to denote monitoring wells, piezometers, or other devices constructed in a manner similar to a well. Some of the devices listed such as injection and extraction wells can be decommissioned using this guide for information, but are not specifically covered in the text.</p>Note 3<p>Details on the decommissioning of multiple-screened wells are not provided in this guide due to the many methods used to construct these types of wells and the numerous types of commercially available multiple-screened well systems. However, in some instances, the methods presented in this guide may be used with few changes. An example of how this guide may be used is the complete removal of the multiple-screened wells by overdrilling.</p></p><p>1.3 Most monitoring wells and piezometers are intended primarily for water quality sampling, w......

实施日期: 1999-12-10

中标分类号: P13 - 工程建设 - 工程地质、水文地质勘察与岩土工程

ICS分类号: 93.025 - 土木工程

标准组织: ASTM - 美国材料与试验协会标准

全文来源: WF

中文关键词: 监督(认可) 污染控制 地下水保护 钻井

语种: 汉语

页数: 16

标准解读