请选择需要导出的字段:
ASTM D6235-2004(2010)
Standard Practice for Expedited Site Characterization of Vadose Zone and Ground Water Contamination at Hazardous Waste Contaminated Sites
适用范围:<p><span class="italic"><span class="italic">The ESC Process</span>8212;</span>This practice describes a process for characterizing ground-water contamination at sites, that provides cost-effective, timely, high-quality information derived primarily from judgement-based sampling and measurements by an integrated, multidisciplinary project team during a limited number of field mobilizations. (See Appendix X1 for additional background on the ESC process, its distinction from traditional site characterization, and its relationship to other approaches to site characterization and Appendix X6 and Appendix X7 for illustrative examples of the ESC process.)</p> <p><span class="italic"><span class="italic">Determining Appropriateness of ESC</span>8212;</span>The ESC process should be initiated when an ESC client, regulatory authority, and stakeholders determine that contaminants at a site present a potential threat to human health or the environment and the ESC process will identify vadose zone, ground water, and other contaminant migration pathways in a timely and cost-effective manner, especially when decisions concerning remedial or other action must be made as rapidly as possible. Situations where the process may be applicable are as follows:</p> <p><span class="italic"><span class="italic">CERCLA</span>8212;</span>CERCLA remedial investigation/feasibility studies (RI/FS). (See Appendix X2.) This practice should be used in conjunction with U.S. EPA <span class="bold">(37)</span></p> <p><span class="italic"><span class="italic">RCRA</span>8212;</span>RCRA facility investigation/corrective measures studies (RFI/CMS). (See Appendix X2.) </p> <p class="desc" id="N00004"> <span class="smallcap">Note</span> 48212;The ESC process can be continued to include CERCLA feasibility studies and RCRA corrective measures studies (see Section 12), but this practice focuses on its use for site characterization. Section X1.4.5 describes the relationship of the ESC process to the DOE SAFER and EPA SACM programs for accelerating the cleanup of contaminated sites. </p> <p><span class="italic"><span class="italic">ESA</span>8212;</span>Sites where environmental site assessments (ESAs) conducted by using Practice <a href="http://myastm.astm.org/SUBSCRIPTION/NewValidateSubscription.cgi?E1527-HTML">E1527</a>, Practice <a href="http://myastm.astm.org/SUBSCRIPTION/NewValidateSubscription.cgi?E1528-HTML">E1528</a>, and Guide <a href="http://myastm.astm.org/SUBSCRIPTION/NewValidateSubscription.cgi?E1903-HTML">E1903</a> identify levels of contamination requiring further, more intensive characterization of the geologic and hydrologic system of contaminant migration pathways. Section X1.5.3 discusses the relationship between ESAs and the ESC process.</p> <p><span class="italic"><span class="italic">Petroleum Release Sites</span>8212;</span>Large petroleum release sites, such as refineries. The user should review both this practice and Guide <a href="http://myastm.astm.org/SUBSCRIPTION/NewValidateSubscription.cgi?E1912-HTML">E1912</a> to evaluate whether the ESC or ASC process is more appropriate for such sites.</p> <p><span class="italic"><span class="italic">Subsurface Radioactivity</span>8212;</span>Sites or facilities with subsurface contamination by radioactivity not regulated by RCRA or CERCLA.</p> <p><span class="italic"><span class="italic">Defense Department Base Closure Actions</span>8212;</span>where vadose zone and ground water contamination are present.</p> <p><span class="italic"><span class="italic">Other Subsurface Contamination</span>8212;</span>Other sites or facilities where contaminant migration in the vadose zone and ground water is a matter of concern and heterogeneity of the vadose zone and ground water system or potential complex behavior of contaminants requires use of the ESC process. </p> <p><span class="italic"><span class="italic">Defining Objectives and Data Quality Requirements</span>8212;</s......<p id......
实施日期: 2004-01-01
中标分类号: Z23 - 环境保护 - 工业废水、污染物分析方法
ICS分类号: 13.030.99 - 环境和保健、安全 - 有关废物的其他标准
标准组织: ASTM - 美国材料与试验协会标准
全文来源: WF
英文关键词: environmental site characterization exploration feasibility studies field investigations geological investigations geophysical investigations groundwater hydrologic investigations maps preliminary investigations reconnaissance surveys sampling site characterization site investigations subsurface investigations:Contamination--environmental Environmental site assessment (ESA)--soil/rock Hazardous waste materials Health hazards Human health and safety Hydrogeologic models/investigations Vadose zone monitoring Waste materials/processing/analysis
语种: 汉语
页数: 51
知识产权声明 | 服务承诺 | 联系我们 | 客户服务 | 关于我们
网络出版服务许可证:(署)网出证(京)字第072号 互联网药品信息服务资格证书号:(京)-经营性-2016-0015 信息网络传播视听节目许可证 许可证号:0108284
万方数据标准管理系统V2.0 证书号:软著登字第11198474号
京ICP证:010071 京公网安备11010802020237号 京ICP备08100800号-1
客服电话:4000115888 客服邮箱:service@wanfangdata.com.cn 违法和不良信息举报电话:4000115888 举报邮箱:problem@wanfangdata.com.cn 举报专区:https://www.12377.cn
万方数据知识服务平台--国家科技支撑计划资助项目(编号:2006BAH03B01)©北京万方数据股份有限公司 万方数据电子出版社