DIN EN 60965-2011

核电厂 控制室 不进入主控制室实现反应堆停堆的辅助控制点

Nuclear power plants. Control rooms. Supplementary control points for reactor shutdown without access to the main control room (IEC 60965:2009); German version EN 60965:2011

ICS分类号: 27.120.20 - 能源和热传导工程 - 核电站、安全

标准组织: DIN - 德国国家标准学会标准

全文来源: WF

英文关键词: Back-up shutdown centres Control Control centres Control panels Control rooms Cutoff Cut-out devices Definitions Design Electrical engineering Nuclear reactors Nuclear safety Nuclear technology Nuclear-electric power stations Safety Safety engineering Specification (approval)

语种: 汉语

页数: 23