查看标准

请选择需要导出的字段:

IEC/TS 61400-26-2-2014

风力涡轮机 第26-2部分:风力涡轮的可生产性

Wind turbines. Part 26-2:Production-based availability for wind turbines

适用范围:IEC TS 61400-26-2:2014 provides a framework from which production-based performance indicators of a wind turbine generator system can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive performance indicators. The approach of this part of IEC 61400 is to expand the time allocation model,introduced in IEC TS 61400-26-1,with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation. This document also includes informative annexes with: - examples of determination of lost production, - examples of algorithms for production-based indicators, - examples of other performance indicators, - examples of application scenarios.

发布日期: 2014-06-04

实施日期: 2014-06-04

ICS分类号: 27.180 - 能源和热传导工程 - 风力涡轮机和其他能源

标准组织: IEC - 国际电工委员会标准

全文来源: WF

英文关键词: Availability Communication technology Conformity Conformity testing Control engineering Control technology Definitions Electrical engineering Measurement Measuring techniques Monitoring Performance Power generating plant Process control Production Rating tests Testing Testing conditions Wind power Wind power stations Wind turbines

语种: 汉语

标准解读