Suspended monorails for mining; winding-drum with suspension hook; dimensions and requirements
Suspended monorails for mining; suspension claws; requirements and testing
Suspended monorails for mining; mounting regulations for cable-driven suspended monorails
Lifting appliances--Vocabulary--Underslung monorail systems
发布日期:1986-11-01 实施日期:1987-06-30
Force-guided tram-ways in mining - Part 2: Monorails; structure and terms
Suspended monorails for mining; transport boxes; dimensions and requirements
Measurement of airborne noise emitted by machines; enveloping surface method; diesel traction trolleys
Capture-track rail installations in mining; bolted couplings for rope-hauled and self-propelled rail installations; bolted coupling 30
Force-guided tram-ways in mining - Part 1: Survey; structure and terms
Monorails for mining - Rails - Part 3: Straight rails and rail-connections for profiles I 140 V and I 250
Suspended monorails for mining - Mounting regulations - Part 2: for loco-driven suspended monorails
Suspended monorails for mining - Mounting regulations - Part 3: Calculations
Monorails for mining - Tested round steel chains for suspensions - Tested, long link
Suspended monorails for mining; rope positions, mounting devices, clearance dimensions for bogies
Monorails for mining; rails; Part 2: curved rails, adapting rails for profile I 140 E
请选择需要导出的字段:
请选择需要导出的字段:
知识产权声明 | 服务承诺 | 联系我们 | 人才招聘 | 客户服务 | 关于我们
互联网出版许可证:新出网证(京)字042号 互联网药品信息服务资格证书号:(京)-经营性-2011-0017 信息网络传播视听节目许可证 许可证号:0108284
京ICP证:010071 京公网安备11010802020237号 京ICP备08100800号-1
客服电话:4000115888 客服邮箱:service@wanfangdata.com.cn 违法和不良信息举报电话:4000115888 举报邮箱:problem@wanfangdata.com.cn 举报专区:https://www.12377.cn
万方数据知识服务平台--国家科技支撑计划资助项目(编号:2006BAH03B01)©北京万方数据股份有限公司 万方数据电子出版社