Technological guide for assembly and welding of metal spiral case of turbine
发布日期:1997-06-20 实施日期:1997-11-01
Construction technology guide for the assembling of busbar and jumper in converter station at ±800kV and below
发布日期:2012-04-06 实施日期:2012-07-01
Construction technology guide for the assembly and erection of the steel towers of ±800kV overhead transmission line
发布日期:2013-03-07 实施日期:2013-08-01
Construction technology guidance for the assembling and erection of the steel towers of 750k V overhead transmission line
实施日期:2007-03-01
Guide for installation technology of bulb turbine-hgdrogenerating unit
发布日期:1994-11-14 实施日期:1995-03-01
Construction technology guide for the assembly and erection of the steel towers of large crossing of overhead transmission line
发布日期:2013-03-07 实施日期:2013-08-01
Construction technology guidance for tension stringing of 750k V overhead transmission line
发布日期:2006-09-14 实施日期:2007-03-01
The Technical Guidelines for the Creep Cavity Inspection of Low Alloy Heat Resistant Steels
发布日期:1994-08-03 实施日期:1994-12-01
Guide on insulation treatment for electric tools
发布日期:2013-10-17 实施日期:2014-03-01
Technological guide for erection and welding of split runner of Francis turbine
实施日期:1997-11-01
请选择需要导出的字段:
请选择需要导出的字段:
知识产权声明 | 服务承诺 | 联系我们 | 人才招聘 | 客户服务 | 关于我们
互联网出版许可证:新出网证(京)字042号 互联网药品信息服务资格证书号:(京)-经营性-2011-0017 信息网络传播视听节目许可证 许可证号:0108284
京ICP证:010071 京公网安备11010802020237号 京ICP备08100800号-1
客服电话:4000115888 客服邮箱:service@wanfangdata.com.cn 违法和不良信息举报电话:4000115888 举报邮箱:problem@wanfangdata.com.cn 举报专区:https://www.12377.cn
万方数据知识服务平台--国家科技支撑计划资助项目(编号:2006BAH03B01)©北京万方数据股份有限公司 万方数据电子出版社