发布日期:2016-11-01 实施日期:2016-11-01
实施日期:2011-07-31
发布日期:2015-07-07 实施日期:2015-07-07
Power systems management and associated information exchange. Data and communications security. Part 8:Role-based access control
适用范围:IEC/TS 62351-8:2011(E) covers the access control of users and automated agents to data objects in power systems by means of role-based access control. The scope of this specification covers everything ...
发布日期:2011-09-29 实施日期:2011-09-29
Communication networks and systems for power utility automation. Part 4: System and project management (IEC 61850-4:2011); German version EN 61850-4:2011
Communication networks and systems for power utility automation. Part 8-1: Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 (IEC 61850-8-...
Application integration at electric utilities. System interfaces for distribution management. Implementation profiles
发布日期:2013-11-30 实施日期:2013-11-30
Communication networks and systems for power utility automation. Conformance testing
发布日期:2013-07-31 实施日期:2013-07-31
Communication networks and systems for power utility automation. Part 7-510:Basic communication structure. Hydroelectric power plants. Modelling concepts and guidelines
适用范围:IEC/TR 61850-7-510:2012(E) provides explanations on how to use the Logical Nodes defined in IEC 61850-7-410 as well as other documents in the IEC 61850 series to model complex control functions in powe...
实施日期:2012-03-22
实施日期:2015-07-23
发布日期:2016-06-15 实施日期:2016-06-15
Telecontrol equipment and systems. Part 5-601:Transmission protocols. Conformance test cases for the IEC?60870-5-101?companion standard
适用范围:This part of IEC 60870describes test cases for conformance testing of telecontrol equipment, Substation Automation Systems (SAS) and telecontrol systems, including front-end functions of SCADA. The use...
发布日期:2015-10-08 实施日期:2015-10-08
Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
适用范围:IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous ...
发布日期:2012-10-30 实施日期:2012-10-30
请选择需要导出的字段:
请选择需要导出的字段:
知识产权声明 | 服务承诺 | 联系我们 | 客户服务 | 关于我们
网络出版服务许可证:(署)网出证(京)字第072号 互联网药品信息服务资格证书号:(京)-经营性-2016-0015 信息网络传播视听节目许可证 许可证号:0108284
万方数据标准管理系统V2.0 证书号:软著登字第11198474号
京ICP证:010071 京公网安备11010802020237号 京ICP备08100800号-1
客服电话:4000115888 客服邮箱:service@wanfangdata.com.cn 违法和不良信息举报电话:4000115888 举报邮箱:problem@wanfangdata.com.cn 举报专区:https://www.12377.cn
万方数据知识服务平台--国家科技支撑计划资助项目(编号:2006BAH03B01)©北京万方数据股份有限公司 万方数据电子出版社